Multi-Site Fleet Operations
This system view maps how a multi-site battery fleet is operated as grid infrastructure: hub-based topology, real-time dispatch control, service allocation, and compliance governance. It connects physical assets to market interfaces and performance SLAs.
Grid Stabilization & Flexibility Layer • Real-Time Dispatch Control
16 Sites • 92 MW Total
DE, NL, FR Network
Hub-Based Topology • <50ms Latency
Grid Code Compliant
230kV / 110kV Interface