Renewable Regulatory Intelligence System

Multi-Level Compliance Engine

Diese Compliance-Engine bildet supranationale, nationale und Grid-Level-Regulierungen in automatisierte Eligibility-Logik ab.

Enthält

  • Feed-in-Tariff-Degression-Modellierung
  • Incentive-Regel-Engine
  • Automatisierte Eligibility-Matrix
  • Compliance-Scoring
  • Finanzielle Impact-Simulation

Verwendet für

  • Pre-Approval-Validierung
  • Incentive-Optimierung
  • Regulatorische Risikoprognose
  • Dokumentationsvollständigkeitskontrolle
Prototype 03

Renewable Regulatory Intelligence System

Multi-Level Compliance Engine & Automated Incentive Calculation

Regulatory Hierarchy
Level 1 – Supranational
EU Directives
International Standards
Level 2 – National
Germany (EEG, KfW)
UAE (DEWA)
Level 3 – Regional / Utility
Grid Operator Rules
Local Authority Permits
Regulatory Update Feed
API StatusActive
Last Update2026-02-14
Next Review2026-03-01
Auto-sync with:
National Registry
Grid Operator
Subsidy Authority
Incentive Logic Engine
Rule Processing & Eligibility Assessment
Eligibility Rule Engine
Capacity Threshold
500 kW
Storage Ratio Requirement
≥50%
Grid Type
Grid-Connected
Commissioning Date
2024-Q2
Self-Consumption Ratio
≥30%
CapEx Threshold
€850k
Decision Matrix
IF capacity > 300 kW AND storage included
Eligible for Hybrid Incentive Tier
Feed-in Tariff Degression Curve
2024
€0.092
expired
2025
€0.085
active
2026
€0.078
projected
Claim Window Timeline
Application Deadline2026-03-31
Approval Window45 days
Disbursement PhaseQ3 2026
Compliance Layers
Technical Compliance100%
Financial Compliance95%
Environmental Compliance100%
Grid Code Compliance88%
Documentation Completeness92%
Regulatory Risk Index
Grid Approval RiskLow
Incentive Approval RiskMedium
Policy Change ExposureModerate
Grid Capacity RiskLow
Audit Log
Application Submitted
2026-01-12
Regulatory Review
2026-01-20
Correction Required
2026-01-25
Final Approval
Pending
Financial Impact Model
IRR Enhancement & Payback Analysis
CapEx Reduction
€125,000
+2.1%
Operational Subsidy
€0.085/kWh
+1.8%
Tax Shield Effect
€37,500
+0.9%
Financing Impact
-0.8% Rate
+0.6%
Total Incentive Value
€125,000
+ €0.085/kWh for 20 years
Projected IRR Increase
+3.4%
Base: 10.8% → Enhanced: 14.2%
Payback Reduction
-2.1 years
From 8.9y → 6.8y
What-if Scenario Simulation
Impact analysis of configuration changes
Scenario Change
Storage Capacity
250 kWh400 kWh
Effect on Incentives
Additional Incentive Tier Unlocked
Feed-in Premium Increase +€0.012/kWh
Grid Stability Bonus Eligible